556th
Strategic Missile Squadron

Presque Isle AFB                    Plattsburgh AFB
  Presque Isle, Maine           Plattsburgh, New York
    
 Snark   SM-62                   Atlas F   SM-65
 1959- 1961                        1962 - 1965

Home Up

Atlas F Documents

This page is where documents pertaining to the 556th SMS will be listed.  There will be different sections including maps, historical documents, etc.  If you should have any documents or photos that you wish to share, please contact us.

Many of the documents are available for download to your system.  PLEASE NOTE:  Take note of the file sizes before downloading.  These files are large in size and may take some time to download.  A high speed Internet connection is recommended.  These files can be viewed using Acrobat Reader.  You can download your free copy of Acrobat Reader here.  To save the file to your local system, right click the PDF file name or the PDF icon and choose the "Save Target As" option.

Diagrams

AtlasF_Color_LCCLayout.jpg (102025 bytes)   SAC_CEM_21-SM65F-2-19-8_Page1-11.jpg (123981 bytes)   SAC_CEM_21-SM65F-2-19-8_Page1-12.jpg (136257 bytes)   TO_21-SM65F-2-19-8_Page3-6.jpg (102812 bytes)

AtlasF_Color_SiloLayout.jpg (152082 bytes)   AccessAndWalkways_G-2.jpg (119014 bytes)   AccessAndWalkways_G-4.jpg (149841 bytes)   AccessAndWalkways_G-6.jpg (126451 bytes)

TO_21-SM65F-2-19-8_Page1-6.jpg (161982 bytes)
Site 2

 

 

Development

(22 Mb)   SAC Missile Chronology 1939-1988

(19 Mb)   Silo Full Scale Mockup Photograph Record - Volume1

 

 

Construction History

(36.7 Mb) 556thSMS Construction History

(77.4 Mb) 556thSMS Construction History (Updated)
This version of the Construction History has been updated with some photos that are of a higher
quality than what was available in the original version.  Also, an effort was made during
scanning and processing to provide a document that is more clear and easier to read.
(Please note that the file is considerably larger in size and will take time to download)

 

 

General Dynamics

(12.5 Mb)   Integrating Contractors Base Activation Project Manual

(17.8 Mb)   Ground Operational Equipment List

(53.1 Mb)   Ground Support Equipment List

 

 

Deactivation

(31.3 Mb)   AFLC Phaseout Atlas E F Titan1

(8.8 Mb)   Atlas Deactivation Procedure A109

(3.5 Mb)   History Of Atlas Phaseout

(34.9 Mb)   SBAMA Equipment Removal Plan Atlas F

(22.8 Mb)   SBAMA Phaseout Atlas E F Titan1

 

Please contact us with questions or comments about this web site.
Copyright © 2004-2010                               556th SMS Association